Start with the measurement purpose

Current transformer (CT) selection begins with the signal the equipment must provide—not with a ratio chosen in isolation. In new switchgear, CTs may serve protective controls, operational metering, revenue-related measurement, or more than one function. Each use has different requirements for the current range, accuracy, response, and connected devices. Identify which circuits need CTs and whether protection and metering require separate cores or devices; a shared CT arrangement should not be assumed suitable.

The project team should document the system configuration, expected operating current, equipment function, and the instruments, relays, or control interfaces to be connected. Confirm who is responsible for defining each requirement, including the electrical engineer, equipment manufacturer, metering party, and relevant authority where applicable. These inputs let the switchgear design align the CT selection with the intended application and associated drawings.

Choose a ratio for the operating range

The CT ratio relates primary current to the secondary signal delivered to connected equipment. For example, the intended ratio must reflect the circuit's specified operating range and the input expected by the meter or relay. A ratio that is poorly matched may limit useful resolution at normal load or place the measurement outside an instrument's intended range. Maximum circuit rating alone does not establish the best ratio; load profile, expected variation, protection functions, and device requirements all matter.

Provide anticipated normal and peak operating conditions, system design data, and the exact input requirements for each connected device. Confirm secondary-current conventions and compatibility rather than assuming a standard value. If one CT is proposed for multiple functions, verify that the devices' requirements and burden work together. The final ratio should be coordinated with the switchgear one-line, control schematics, metering documents, and equipment schedules.

Define duty and accuracy by function

Duty describes what the CT is expected to do under the project's operating and fault conditions. A metering CT and a protection CT can have different performance objectives: measurement accuracy across an operating range is not interchangeable with the behavior needed by a protective relay during fault conditions. Specify the function, applicable performance class or requirements, and relevant system conditions. The appropriate criteria depend on the design and project; no one accuracy designation should be presumed suitable for every application.

Ask the engineer or metering authority to state the required accuracy and operating range, and ask the protection designer to identify relay needs and fault-related criteria. Confirm whether separate cores are required and how each is assigned. These decisions affect CT selection, wiring, drawings, and device coordination. Applicable standards and evaluation requirements depend on the equipment design and project; verify them rather than assuming a particular listing or standard applies.

Account for burden and the full circuit

Burden is the load connected to a CT secondary, including instruments, relay inputs, leads, and connections. The total circuit burden must be considered against the CT's specified performance. Long lead runs, conductor size, terminal connections, and multiple devices can affect the circuit and should be included in the design review. Selecting a ratio and accuracy target without understanding the connected secondary circuit can leave a specification incomplete.

Provide the planned device models or input data, secondary wiring arrangement, approximate lead routing, and conductor information when available. The design team can then assess whether the proposed CT and connected circuit are compatible. Clarify terminal identification, polarity, grounding approach, and test or shorting provisions where required by the design. CT secondary circuits require careful handling; work and testing procedures should be established by qualified personnel, with no assumption that energized work is acceptable.

Coordinate interfaces, drawings, and verification

A complete CT package connects the physical switchgear arrangement to the controls and metering documents. Confirm CT location and orientation, primary conductor arrangement, core assignments, secondary terminals, and destinations for each circuit. Reconcile those details across the one-line diagram, elementary schematics, wiring diagrams, instrument schedules, and metering requirements. If external devices or a third-party metering interface are involved, identify the interface owner and required terminal or signal information early.

During design review, check that ratios, accuracy requirements, duty, and burden are consistent across the equipment schedule and connected-device documentation. Define project-appropriate inspection and testing expectations, responsibilities, and records before release. Testing scope and acceptance criteria depend on the design and contract documents; do not infer them from a CT label alone. Qualified electrical professionals should review the design and applicable requirements, with relevant authorities involved where required.

Prepare a procurement-ready CT schedule

For a practical request for quotation, submit the one-line diagram, circuit and system data, expected operating range, CT function, required ratio, accuracy and duty criteria, connected device inputs, and burden information. Include the number of cores or separate CTs needed, mounting and conductor constraints, terminal preferences, and required drawing or test documentation. Mark unresolved items clearly and identify who will approve the final technical choices; a vendor should not have to infer protection or metering intent from a ratio alone.

When specifying new switchgear, ask the manufacturer to review the CT schedule against the proposed assembly and documented interfaces. Confirm which requirements are included in the design, what information remains outstanding, and how revisions will be reflected in drawings before approval. For Austin and Central Texas projects, provide the site location, requested schedule, delivery constraints, and coordination contacts so manufacturing and shipment planning can be considered. Lead time depends on the project and confirmed scope.

Project specification checklist

Use this checklist to organize the details for a project-specific review. Final ratings, applicable standards and equipment selections depend on the approved design.

ItemWhat to confirm
CT functionIdentify protection, metering, or combined use and whether separate cores are required.
Ratio and current rangeConfirm expected operating conditions, maximum design requirements, and connected-device input.
Duty and accuracyDocument application-specific performance criteria and the responsible design authority.
Secondary burdenInclude device inputs, lead routing, conductor details, and other connected loads.
Interfaces and recordsCoordinate terminals, polarity, core assignments, drawings, and project-defined verification.